
Link transport and tote handling
Digit's arms and mobile body transfer totes between configured warehouse stations, including loading and unloading mobile robots.
Buy Short-term rent Long-term rent RaaS
Deployment and support across MENA

Agility RoboticsHumanoids
Digit transfers totes between configured workstations and mobile robots. Agility Arc coordinates tasks, tracks the fleet and connects the robot to warehouse systems.
Digit-family planning allowances, not prices for an identified generation or configuration. The supplied robot, end effectors, charger, Arc scope and workcell integrations are itemised in the quotation, along with freight, tax, deployment and service; this is not a confirmed Saudi retail offer.
This is a Digit-family project assessment, not an identified hardware generation. The scope is a tote-transfer study covering the tote, transfer heights, AMR handoff and charging layout; no generation-specific sizing or shift guarantee is implied.
Manufacturer-documented connections and compatible equipment. Building interfaces are checked against your installation.
Task orchestration, fleet monitoring, charger coordination and warehouse-system integration.
Documented integrations for dispatching mobile robots and coordinating material handoffs.
No. Digit 5 is a separate generation with announced early access in the first half of 2027. This family listing is a warehouse-project assessment, not a Digit 5 supply offer.
A defined tote transfer between workstations or AMRs, including grasp positions, access, stopping controls and the charging layout. Payload, tote envelope and duty cycle belong to the selected generation.
Agility documents MiR and Zebra integrations through Arc. Those references establish an integration approach, not compatibility with every AMR model.
Compare the approaches and site requirements in these related solution guides.
We help define the right setup for your operation, from site assessment and integration to team training and ongoing support.
Equipment, installation and service responsibilities are agreed in your proposal.
Discuss your deploymentShare your task and location. We’ll help define the configuration and commercial terms.
